Demonstration of hydropower technologies for efficient and forward-looking refurbishment of existing hydropower plants
- Deadline
- 1 December 2027
- Budget
- €10,000,000
- Eligibility
- EU
About this call
Expected Outcome:
For a renewables-based electricity system sufficient flexible and also in the long-run fully sustainable hydropower capacity is pivotal.
Project results are expected to contribute to all of the following expected outcomes:
Enhancing the capacities of the hydropower fleet to contribute with variable renewables base load to a secure and stable electricity system, including by modernising grid integration and hydropower fleet control.
Increase technology leadership, competitiveness and technology export potential of European hydropower industry.
Address challenges of climate change adaptation for a forward-looking and stable operation of sustainable hydropower for the coming decades.
Scope:
Demonstration of hydropower technology solutions which allow for efficient and forward-looking refurbishment of existing hydropower plants. Provided solutions must be socioeconomically and environmentally sustainable (including biodiversity) and provide a respective assessment. Issues which can be addressed are for example: Innovative design of turbines (and also draft tubes, nozzles and distributors) and generators, including innovative improvements based on future load cycles and extending their intended life time; new models and simulation tools for harsher operational conditions; digitalisation and artificial intelligence to advance instrumentation and controls and flexibility and to develop innovative operational strategies towards reduced O&M costs; transient aspect linked to new operating patterns of hydro plants to cope with climate changes and renewable base load; new materials for increased efficiency and resistance of equipment and increased performance, life time and resilience of infrastructure including e.g. phasing out of PFAS and mineral oils; low-GHG balance concrete; automated maintenance of metal hydropower turbines to reduce cost; operator hazards and reduce LCoE related to OPEX; Improving water uses resilience via integrated operations and management; simulation and forecasting tools for integrated risk and mitigation analysis for climate change adaptation and in response to extreme weather events by taking fully into account biodiversity requirements by targeting good ecological status and e.g. fish migration; water flows and sediment dynamics not hampering flexible hydropower production, innovative techniques for enhancing the life time of concrete structures and the overtopping safety of embankment and rockfill structures.
null
Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B. Activities may start at any TRL.
Focus areas
How to apply
- Submit before 1 December 2027 (419 days left).
- Plan your budget within the €10,000,000 maximum.
- Structure the proposal around the call's evaluation criteria and expected impact.
- Get the templates and submission portal from the official call page.
Guides for this programme
Apply to this call
Upload the official call document to Proposia and get a complete, structured draft proposal tailored to this call's requirements.
More calls from EU Funding & Tenders Portal
- Co-funded European Partnership for Social Transformations and ResilienceDeadline 13 October 2026
- DeepRAP: Deep Reasoning, Abstraction & Planning towards trustworthy Cognitive AI SystemsDeadline 28 October 2026
- EIC defence callDeadline 28 October 2026
- Advanced Materials for Miniaturised Energy Harvesting SystemsDeadline 28 October 2026
- Biotechnology for Healthy AgeingDeadline 28 October 2026
- Improving capabilities of law enforcement to counter climate-related challengesDeadline 5 November 2026
Data sourced from EU Funding & Tenders Portal, last checked 24 August 2026. Always verify details on the official call page before applying.