ClosedEuropean Commission — Connecting Europe Facilitygrant

Alternative Fuel Infrastructure Facility: Road & Air Transport - works

Deadline
6 October 2026
Budget
See official call
Eligibility
EU
This call has closed (deadline was 6 October 2026). Many programmes repeat annually — check the official page for the next round, or browse currently open calls.

About this call

Objective:

The objective of this call is to support the deployment of alternative fuels supply infrastructure for road transport, and airport ground operations, contributing to decarbonising transport along the TEN-T network.

Scope:

1. General provisions

Activities eligible for funding under this call relate to the deployment of alternative fuels supply infrastructure.

The infrastructure shall be deployed in accordance with:

Regulation (EU) 2023/1804 of the European Parliament and of the Council of 13 September 2023 on the deployment of alternative fuels infrastructure (hereafter “the AFIR Regulation”) and,

Regulation (EU) 2024/1679 of the European Parliament and of the Council of 13 June 2024 on Union guidelines for the development of the trans-European transport network, amending Regulation (EU) 2021/1153 and (EU) 913/2010 and repealing Regulation (EU) 1315/2013, and,

The requirements listed below.

The definitions set in AFIR and the TEN-T Regulations apply to this call for proposals.

2. Publicly accessible charging pools for Heavy Duty Vehicles (HDV)

Infrastructure Publicly accessible recharging pools dedicated to heavy-duty vehicles equipped with at least 4 Megawatt Charging System (MCS) recharging points having each a minimum power output of 1MW; however not necessarily charging simultaneously at their maximum power.

Publicly accessible recharging pools dedicated to heavy-duty vehicles equipped with a combination of at least 4 MCS recharging points having each a minimum power output of 1MW) and of Combined Charging System (CCS) recharging points having each a minimum power output of 350kW (however not necessarily charging simultaneously at their maximum power). In this case, for each pool, the number of supported recharging points with a minimum power output of 350kW cannot exceed the number of supported recharging points with a minimum power output of 1MW.

The following elements strictly related to the recharging infrastructure deployment inside the recharging pool area are eligible for support: construction costs including chargers or power cabinet serving charging satellites, canopy, safety and security devices, parking, circulation, and electricity infrastructure (including cabling, electricity substations, batteries and on-site dynamic energy management devices).

Locations

The recharging infrastructure must be located:

on the TEN-T road network or within 3 km driving distance from the nearest exit of a TEN-T road,

in Safe and Secured Parking Areas (SSPA) certified Bronze, Silver, Gold or Platinum levels, in line with Commission Delegated Regulation (EU) 2022/1012, and located on the TEN-T road network or within 3 km driving distance from the nearest exit of a TEN-T road [1],

in TEN-T urban nodes, including in port and airport areas provided that the horizontal requirements mentioned in 2.2.5 below are fulfilled.

3. Electrification of airport ground operations

Infrastructure Electricity and preconditioned air supply to stationary aircraft and airships through fixed or zero-tailpipe emission mobile equipment.

Electricity supply facilities for ground operation vehicles.

Electricity supply facilities for electric or hybrid electric aircraft and airships.

Related and electricity storage inside the airport area.

Location In TEN-T airports.

4. Horizontal requirements for all alternative fuels infrastructure

The beneficiary shall operate and maintain the supported infrastructure for a minimum period of 5 years starting from the end date of the related grant agreement. For beneficiaries operating under a Public Service Obligation contract which expires before the end of the 5-year period, this requirement will be fulfilled if the supported infrastructure is transferred and operated by the successor contract holder until the end of the 5-year period.

5. Horizontal requirements for all publicly accessible electricity recharging points for Heavy Duty road transport

The recharging points must comply with the requirements set in the AFIR Regulation.

The charging pools must be publicly accessible on a 24/7 basis irrespective of whether the infrastructure is located on a public or private site or premise.

Preparing for the next round

  1. This round closed on 6 October 2026; check whether the programme has announced its next round.
  2. Structure the proposal around the call's evaluation criteria and expected impact.
  3. Get the templates and submission portal from the official call page.

Guides for this programme

Prepare for the next round

Upload the official call document to Proposia and get a complete, structured draft proposal tailored to the programme's requirements.

More calls from EU Funding & Tenders Portal

Data sourced from EU Funding & Tenders Portal, last checked 6 October 2026. Always verify details on the official call page before applying.